I-75 (sr-93) over Camp Branch Creek

Good Condition64 years old40,000 vehicles/day

Location

StateFlorida
CountyHamilton
Location3.9 Mi.n.of Suwannee Riv.
CarriesI-75 (sr-93)
CrossesCamp Branch Creek
Coordinates30.38944, -82.87583

Condition Ratings

Overall ConditionGood
Channel/Waterway6 (Satisfactory)
Culvert7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignCulvert
Total Length21.0 ft (6.4 m)
Max Span9.8 ft (3 m)
Deck Area117.1 sq m
Main Spans2
Year Built1962

Traffic

Avg Daily Traffic40,000 (2022)
Truck Traffic30%
Lanes On Bridge6

Inspection & Ownership

Last Inspection323
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number320043

Nearby Bridges