NW 20th ST WB over Lwdd E-4 (el Rio) Canal
Fair Condition64 years old9,050 vehicles/day
Location
| State | Florida |
| County | Palm Beach |
| Location | 0.5mi W Of N Dixie Highwy |
| Carries | NW 20th ST WB |
| Crosses | Lwdd E-4 (el Rio) Canal |
| Coordinates | 26.36968, -80.09467 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Slab |
| Total Length | 60.0 ft (18.3 m) |
| Max Span | 20.0 ft (6.1 m) |
| Deck Width | 36.1 ft (11 m) |
| Deck Area | 201.3 sq m |
| Main Spans | 3 |
| Year Built | 1962 |
Traffic
| Avg Daily Traffic | 9,050 (2023) |
| Truck Traffic | 8% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | October 2024 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 934421 |