New Macland Road over Silver Comet Trail
Good Condition28 years old2,047 vehicles/day
Location
| State | Georgia |
| County | Cobb |
| Location | In Powder Springs |
| Carries | New Macland Road |
| Crosses | Silver Comet Trail |
| Coordinates | 33.86219, -84.67571 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 196.9 ft (60 m) |
| Max Span | 73.2 ft (22.3 m) |
| Deck Width | 54.5 ft (16.6 m) |
| Deck Area | 996 sq m |
| Main Spans | 3 |
| Year Built | 1998 |
Traffic
| Avg Daily Traffic | 2,047 (2024) |
| Truck Traffic | 1% |
| Lanes On Bridge | 3 |
Inspection & Ownership
| Last Inspection | 523 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000006751860 |