SR 21 over Sweigoffer Creek

Good Condition66 years old36,200 vehicles/day

Location

StateGeorgia
CountyEffingham
Location1 Mi S Of Rincon
CarriesSR 21
CrossesSweigoffer Creek
Coordinates32.26557, -81.22250

Condition Ratings

Overall ConditionGood
Channel/Waterway8 (Very Good)
Culvert7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignCulvert
Total Length24.9 ft (7.6 m)
Max Span4.9 ft (1.5 m)
Deck Area139.1 sq m
Main Spans4
Year Built1960 (reconstructed 1990)

Traffic

Avg Daily Traffic36,200 (2024)
Truck Traffic1%
Lanes On Bridge4

Inspection & Ownership

Last Inspection324
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number000000010300040

Nearby Bridges