Northside DR (nbl) over M-9150 Third Street
Fair Condition52 years old37,900 vehicles/day
Location
| State | Georgia |
| County | Fulton |
| Location | In N Atlanta |
| Carries | Northside DR (nbl) |
| Crosses | M-9150 Third Street |
| Coordinates | 33.77657, -84.40633 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 222.1 ft (67.7 m) |
| Max Span | 73.2 ft (22.3 m) |
| Deck Width | 46.6 ft (14.2 m) |
| Deck Area | 961.3 sq m |
| Main Spans | 4 |
| Year Built | 1974 |
Traffic
| Avg Daily Traffic | 37,900 (2024) |
| Truck Traffic | 1% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 423 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000012100110 |