US 29 SR 14 Main over M-9064 Norman Berry RD
Good Condition64 years old9,340 vehicles/day
Location
| State | Georgia |
| County | Fulton |
| Location | In East Point |
| Carries | US 29 SR 14 Main |
| Crosses | M-9064 Norman Berry RD |
| Coordinates | 33.68458, -84.44048 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 86.0 ft (26.2 m) |
| Max Span | 43.0 ft (13.1 m) |
| Deck Width | 89.6 ft (27.3 m) |
| Deck Area | 715.3 sq m |
| Main Spans | 2 |
| Year Built | 1962 (reconstructed 1985) |
Traffic
| Avg Daily Traffic | 9,340 (2024) |
| Truck Traffic | 1% |
| Lanes On Bridge | 5 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 524 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000012100450 |