I-285 over M-9058 Mt Gilead Road

Fair Condition59 years old149,000 vehicles/day

Location

StateGeorgia
CountyFulton
LocationIn Southwest Atlanta
CarriesI-285
CrossesM-9058 Mt Gilead Road
Coordinates33.69830, -84.49905

Condition Ratings

Overall ConditionFair
Deck5 (Fair)
Superstructure7 (Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialSteel
DesignStringer/Multi-beam
Total Length159.1 ft (48.5 m)
Max Span68.9 ft (21 m)
Deck Width134.5 ft (41 m)
Deck Area1988.5 sq m
Main Spans3
Year Built1967 (reconstructed 1982)

Traffic

Avg Daily Traffic149,000 (2024)
Truck Traffic1%
Lanes On Bridge8
Lanes Under Bridge2

Inspection & Ownership

Last Inspection323
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number000000012102290

Nearby Bridges