I-85 over Ramp Sr13 Sbl To 403 Sbl
Good Condition42 years old24,300 vehicles/day
Location
| State | Georgia |
| County | Fulton |
| Location | In N Atlanta |
| Carries | I-85 |
| Crosses | Ramp Sr13 Sbl To 403 Sbl |
| Coordinates | 33.80608, -84.38152 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Slab |
| Total Length | 45.9 ft (14 m) |
| Max Span | 45.9 ft (14 m) |
| Deck Width | 170.6 ft (52 m) |
| Deck Area | 728 sq m |
| Main Spans | 1 |
| Year Built | 1984 |
Traffic
| Avg Daily Traffic | 24,300 (2024) |
| Truck Traffic | 3% |
| Lanes On Bridge | 11 |
| Lanes Under Bridge | 1 |
Inspection & Ownership
| Last Inspection | 623 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000012105620 |