I-20 WB To I-75 SB over I-75-3 I75 Rmps- I20 Rmp

Good Condition38 years old6,805 vehicles/day

Location

StateGeorgia
CountyFulton
LocationI-20 & I-75 Interchange
CarriesI-20 WB To I-75 SB
CrossesI-75-3 I75 Rmps- I20 Rmp
Coordinates33.74564, -84.38951

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete Continuous
DesignBox Beam - Single/Spread
Total Length831.0 ft (253.3 m)
Max Span194.9 ft (59.4 m)
Deck Width45.3 ft (13.8 m)
Deck Area3495.5 sq m
Main Spans5
Year Built1988

Traffic

Avg Daily Traffic6,805 (2024)
Truck Traffic1%
Lanes On Bridge1
Lanes Under Bridge15

Inspection & Ownership

Last InspectionNovember 2023
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number000000012106590

Nearby Bridges