I-75 Rmp To I-20WB over M9164 & Rmp- M9166 & Rmp

Good Condition37 years old6,805 vehicles/day

Location

StateGeorgia
CountyFulton
LocationI-75 & I-20 Interchange
CarriesI-75 Rmp To I-20WB
CrossesM9164 & Rmp- M9166 & Rmp
Coordinates33.74580, -84.39387

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete Continuous
DesignBox Beam - Single/Spread
Total Length520.0 ft (158.5 m)
Max Span190.0 ft (57.9 m)
Deck Width46.3 ft (14.1 m)
Deck Area2234.8 sq m
Main Spans3
Year Built1989

Traffic

Avg Daily Traffic6,805 (2024)
Truck Traffic1%
Lanes On Bridge1
Lanes Under Bridge11

Inspection & Ownership

Last Inspection723
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number000000012107060