Rico-tatum Road over Cedar Branch

Good Condition20 years old126 vehicles/day

Location

StateGeorgia
CountyFulton
Location4 Miles West Of Palmeto
CarriesRico-tatum Road
CrossesCedar Branch
Coordinates33.55469, -84.71797

Condition Ratings

Overall ConditionGood
Channel/Waterway6 (Satisfactory)
Culvert7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignCulvert
Total Length32.2 ft (9.8 m)
Max Span32.2 ft (9.8 m)
Deck Area59.8 sq m
Main Spans1
Year Built2006

Traffic

Avg Daily Traffic126 (2024)
Truck Traffic1%
Lanes On Bridge2

Inspection & Ownership

Last InspectionNovember 2024
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number000000012153150

Nearby Bridges