Bobo Section RD over Copeland Creek

Fair Condition35 years old1,100 vehicles/day

Location

StateAlabama
CountyMadison
Location1 Mi. E. Butter * Egg RD
CarriesBobo Section RD
CrossesCopeland Creek
Coordinates34.96193, -86.61937

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure6 (Satisfactory)
Substructure6 (Satisfactory)
Channel/Waterway7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignChannel Beam
Total Length102.0 ft (31.1 m)
Max Span34.1 ft (10.4 m)
Deck Width30.5 ft (9.3 m)
Deck Area289.2 sq m
Main Spans3
Year Built1991

Traffic

Avg Daily Traffic1,100 (1992)
Truck Traffic10%
Lanes On Bridge2

Inspection & Ownership

Last Inspection324
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number015656

Nearby Bridges