Hart Road (fau 254 over Flint Creek Trib
Good Condition4 years old7,600 vehicles/day
Location
| State | Illinois |
| County | Lake |
| Location | 0.3 Mi N Lake-cook R |
| Carries | Hart Road (fau 254 |
| Crosses | Flint Creek Trib |
| Coordinates | 42.15909, -88.15072 |
Condition Ratings
| Overall Condition | Good |
| Deck | 9 (Excellent) |
| Superstructure | 9 (Excellent) |
| Substructure | 9 (Excellent) |
| Channel/Waterway | 9 (Excellent) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 88.9 ft (27.1 m) |
| Max Span | 85.0 ft (25.9 m) |
| Deck Width | 57.7 ft (17.6 m) |
| Deck Area | 477.0 sq m |
| Main Spans | 1 |
| Year Built | 2022 |
Traffic
| Avg Daily Traffic | 7,600 (2023) |
| Truck Traffic | 4% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | November 2022 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 049307900000000 |