I-55/64EB Mainlne" over Uprr Il 3 Ramp Uprr Uprr

Fair Condition31 years old56,600 vehicles/day

Location

StateIllinois
CountySt. Clair
LocationPier Bc1 To Abut C31
CarriesI-55/64EB Mainlne"
CrossesUprr Il 3 Ramp Uprr Uprr
Coordinates38.61639, -90.17676

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure8 (Very Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length3080.1 ft (938.8 m)
Max Span138.1 ft (42.1 m)
Deck Width34.4 ft (10.5 m)
Deck Area9857.4 sq m
Main Spans28
Year Built1995

Traffic

Avg Daily Traffic56,600 (2024)
Truck Traffic13%
Lanes On Bridge2
Lanes Under Bridge2

Inspection & Ownership

Last InspectionDecember 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number082025100000000

Nearby Bridges