Chuichu RD over Santa Rosa Canal

Good Condition39 years old2,281 vehicles/day

Location

StateArizona
CountyPinal
Location0.3 Mi N Jct Houser RD
CarriesChuichu RD
CrossesSanta Rosa Canal
Coordinates32.78218, -111.75727

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure8 (Very Good)
Substructure7 (Good)
Channel/Waterway8 (Very Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length64.0 ft (19.5 m)
Max Span62.0 ft (18.9 m)
Deck Width35.1 ft (10.7 m)
Deck Area208.7 sq m
Main Spans1
Year Built1987

Traffic

Avg Daily Traffic2,281 (2022)
Truck Traffic5%
Lanes On Bridge2

Inspection & Ownership

Last Inspection324
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number08966

Nearby Bridges