Is 95 Viaduct NB over Ponca ST I 895

Fair Condition46 years old64,313 vehicles/day

Location

StateMaryland
CountyBaltimore
Location0.2 Mi. S. Of Exit 57
CarriesIs 95 Viaduct NB
CrossesPonca ST I 895
Coordinates39.27127, -76.55586

Condition Ratings

Overall ConditionFair
Deck7 (Good)
Superstructure6 (Satisfactory)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length1932.1 ft (588.9 m)
Max Span240.2 ft (73.2 m)
Deck Width62.0 ft (18.9 m)
Deck Area11130.2 sq m
Main Spans11
Year Built1980

Traffic

Avg Daily Traffic64,313 (2019)
Truck Traffic11%
Lanes On Bridge4
Lanes Under Bridge9

Inspection & Ownership

Last Inspection224
Inspection FrequencyEvery 24 months
OwnerState Toll Authority
Historical SignificanceBridge is not eligible for the National Register
Structure Number300000BCW570011

Nearby Bridges