I-275 SB over Huron R & Metropark Path

Fair Condition52 years old23,572 vehicles/day

Location

StateMichigan
CountyWayne
LocationNew Boston Village
CarriesI-275 SB
CrossesHuron R & Metropark Path
Coordinates42.14305, -83.38230

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure6 (Satisfactory)
Substructure6 (Satisfactory)
Channel/Waterway6 (Satisfactory)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialSteel
DesignStringer/Multi-beam
Total Length295.6 ft (90.1 m)
Max Span95.1 ft (29 m)
Deck Width70.5 ft (21.5 m)
Deck Area1937.2 sq m
Main Spans4
Year Built1974 (reconstructed 1998)

Traffic

Avg Daily Traffic23,572 (2007)
Truck Traffic18%
Lanes On Bridge4

Inspection & Ownership

Last Inspection524
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number000000000011884

Nearby Bridges