I-275 NB over Huron R & Metropark Path

Fair Condition52 years old23,572 vehicles/day

Location

StateMichigan
CountyWayne
LocationNew Boston Village
CarriesI-275 NB
CrossesHuron R & Metropark Path
Coordinates42.14325, -83.38183

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure6 (Satisfactory)
Substructure6 (Satisfactory)
Channel/Waterway5 (Fair)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialSteel
DesignStringer/Multi-beam
Total Length285.1 ft (86.9 m)
Max Span84.6 ft (25.8 m)
Deck Width56.4 ft (17.2 m)
Deck Area1494.7 sq m
Main Spans4
Year Built1974

Traffic

Avg Daily Traffic23,572 (2007)
Truck Traffic18%
Lanes On Bridge3

Inspection & Ownership

Last Inspection524
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number000000000011885

Nearby Bridges