Is 55 N over Portage Byu

Fair Condition60 years old8,503 vehicles/day

Location

StateMissouri
CountyNew Madrid
LocationS 20 T 21 N R 13 E
CarriesIs 55 N
CrossesPortage Byu
Coordinates36.44072, -89.67266

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure7 (Good)
Substructure6 (Satisfactory)
Channel/Waterway6 (Satisfactory)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length147.0 ft (44.8 m)
Max Span56.1 ft (17.1 m)
Deck Width40.7 ft (12.4 m)
Deck Area555.5 sq m
Main Spans3
Year Built1966 (reconstructed 2005)

Traffic

Avg Daily Traffic8,503 (2024)
Truck Traffic62%
Lanes On Bridge2

Inspection & Ownership

Last InspectionDecember 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number1139

Nearby Bridges