Project RD over Rye CR Br Of Meram

Fair Condition36 years old150 vehicles/day

Location

StateMissouri
CountyFranklin
LocationS 14 T 41 N R 1 E
CarriesProject RD
CrossesRye CR Br Of Meram
Coordinates38.28368, -90.88661

Condition Ratings

Overall ConditionFair
Channel/Waterway6 (Satisfactory)
Culvert6 (Satisfactory)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignCulvert
Total Length41.0 ft (12.5 m)
Max Span13.1 ft (4 m)
Deck Area76.2 sq m
Main Spans3
Year Built1990

Traffic

Avg Daily Traffic150 (2023)
Truck Traffic13%
Lanes On Bridge2

Inspection & Ownership

Last Inspection125
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number21382

Nearby Bridges