Project RD over Rye CR Br Of Meram
Fair Condition36 years old150 vehicles/day
Location
| State | Missouri |
| County | Franklin |
| Location | S 14 T 41 N R 1 E |
| Carries | Project RD |
| Crosses | Rye CR Br Of Meram |
| Coordinates | 38.28368, -90.88661 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 6 (Satisfactory) |
| Culvert | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 41.0 ft (12.5 m) |
| Max Span | 13.1 ft (4 m) |
| Deck Area | 76.2 sq m |
| Main Spans | 3 |
| Year Built | 1990 |
Traffic
| Avg Daily Traffic | 150 (2023) |
| Truck Traffic | 13% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 125 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 21382 |