NE 900 over E Fk Tebo CR
Fair Condition41 years old40 vehicles/day
Location
| State | Missouri |
| County | Henry |
| Location | S 28 T 43 N R 24 W |
| Carries | NE 900 |
| Crosses | E Fk Tebo CR |
| Coordinates | 38.48303, -93.57372 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 35.4 ft (10.8 m) |
| Max Span | 32.5 ft (9.9 m) |
| Deck Width | 20.3 ft (6.2 m) |
| Deck Area | 67.0 sq m |
| Main Spans | 1 |
| Year Built | 1985 |
Traffic
| Avg Daily Traffic | 40 (2023) |
| Truck Traffic | 10% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 225 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 34023 |