RT Tt S over Portage Byu

Good Condition63 years old159 vehicles/day

Location

StateMissouri
CountyNew Madrid
LocationS 2 T 20 N R 13 E
CarriesRT Tt S
CrossesPortage Byu
Coordinates36.40989, -89.61750

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Channel/Waterway7 (Good)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialPrestressed Concrete
DesignTee Beam
Total Length102.0 ft (31.1 m)
Max Span34.1 ft (10.4 m)
Deck Width26.2 ft (8 m)
Deck Area248.8 sq m
Main Spans3
Year Built1963 (reconstructed 2012)

Traffic

Avg Daily Traffic159 (2024)
Truck Traffic23%
Lanes On Bridge2

Inspection & Ownership

Last InspectionDecember 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number8367

Nearby Bridges