IRR BIA RTE 30 over Main Canal
Fair Condition43 years old225 vehicles/day
Location
| State | Montana |
| County | Valley |
| Location | 7.2 Km SW Of Oswego |
| Carries | IRR BIA RTE 30 |
| Crosses | Main Canal |
| Coordinates | 48.04111, -105.95206 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 8 (Very Good) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 4 (Poor) |
| Scour Critical | 4 — Foundations need monitoring |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 42.3 ft (12.9 m) |
| Max Span | 40.0 ft (12.2 m) |
| Deck Width | 34.1 ft (10.4 m) |
| Deck Area | 134.2 sq m |
| Main Spans | 1 |
| Year Built | 1983 |
Traffic
| Avg Daily Traffic | 225 (2024) |
| Truck Traffic | 10% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | October 2024 |
| Inspection Frequency | Every 24 months |
| Owner | Bureau of Indian Affairs |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 00000000000C616 |