IRR BIA RTE 30 over Main Canal
Good Condition16 years old50 vehicles/day
Location
| State | Montana |
| County | Valley |
| Location | .8 Km E Of Pump Station |
| Carries | IRR BIA RTE 30 |
| Crosses | Main Canal |
| Coordinates | 48.03447, -105.99483 |
Condition Ratings
| Overall Condition | Good |
| Channel/Waterway | 7 (Good) |
| Culvert | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Culvert |
| Total Length | 29.9 ft (9.1 m) |
| Max Span | 14.1 ft (4.3 m) |
| Deck Width | 43.0 ft (13.1 m) |
| Deck Area | 119.2 sq m |
| Main Spans | 2 |
| Year Built | 2010 |
Traffic
| Avg Daily Traffic | 50 (2024) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | October 2024 |
| Inspection Frequency | Every 24 months |
| Owner | Bureau of Indian Affairs |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 00000000000C623 |