I-40 Ebl/wbl over Seco Canyon
Fair Condition59 years old28,436 vehicles/day
Location
| State | New Mexico |
| County | Cibola |
| Location | 0.10 Mi E Of Exit 102 |
| Carries | I-40 Ebl/wbl |
| Crosses | Seco Canyon |
| Coordinates | 35.07396, -107.55513 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 7 (Good) |
| Culvert | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 29.9 ft (9.1 m) |
| Max Span | 7.9 ft (2.4 m) |
| Deck Area | 254.8 sq m |
| Main Spans | 3 |
| Year Built | 1967 |
Traffic
| Avg Daily Traffic | 28,436 (2023) |
| Truck Traffic | 45% |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | December 2021 |
| Inspection Frequency | Every 48 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000000006880 |