IRR BIA RTE 30 over San Jose River
Good Condition29 years old1,000 vehicles/day
Location
| State | New Mexico |
| County | Cibola |
| Location | East Edge Of Acomita |
| Carries | IRR BIA RTE 30 |
| Crosses | San Jose River |
| Coordinates | 35.05702, -107.56666 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Slab |
| Total Length | 109.9 ft (33.5 m) |
| Max Span | 41.7 ft (12.7 m) |
| Deck Width | 43.0 ft (13.1 m) |
| Deck Area | 438.9 sq m |
| Main Spans | 3 |
| Year Built | 1997 |
Traffic
| Avg Daily Traffic | 1,000 (2021) |
| Truck Traffic | 10% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 423 |
| Inspection Frequency | Every 24 months |
| Owner | Bureau of Indian Affairs |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 00000000000M139 |