Irr/nm-75 over Rio Del Pueblo
Good Condition38 years old1,188 vehicles/day
Location
| State | New Mexico |
| County | Taos |
| Location | 1.93 Mi W Of Jct Nm-76 |
| Carries | Irr/nm-75 |
| Crosses | Rio Del Pueblo |
| Coordinates | 36.19891, -105.73244 |
Condition Ratings
| Overall Condition | Good |
| Channel/Waterway | 6 (Satisfactory) |
| Culvert | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel |
| Design | Culvert |
| Total Length | 53.1 ft (16.2 m) |
| Max Span | 25.3 ft (7.7 m) |
| Deck Area | 226.8 sq m |
| Main Spans | 2 |
| Year Built | 1988 |
Traffic
| Avg Daily Traffic | 1,188 (2023) |
| Truck Traffic | 11% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | November 2023 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000000008721 |