Irr/nm-75 over Rio Del Pueblo
Good Condition37 years old1,526 vehicles/day
Location
| State | New Mexico |
| County | Taos |
| Location | 2.1 Mi N Of Jct Nm-73 |
| Carries | Irr/nm-75 |
| Crosses | Rio Del Pueblo |
| Coordinates | 36.19083, -105.67086 |
Condition Ratings
| Overall Condition | Good |
| Channel/Waterway | 7 (Good) |
| Culvert | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel |
| Design | Culvert |
| Total Length | 24.9 ft (7.6 m) |
| Max Span | 24.9 ft (7.6 m) |
| Deck Area | 99.6 sq m |
| Main Spans | 1 |
| Year Built | 1989 |
Traffic
| Avg Daily Traffic | 1,526 (2023) |
| Truck Traffic | 11% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | November 2023 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000000008732 |