IRR BIA RTE 39 over Navajo River
Poor Condition53 years old30 vehicles/day
Location
| State | New Mexico |
| County | Rio Arriba |
| Location | 6.6 Km NW Of Dulce Nm |
| Carries | IRR BIA RTE 39 |
| Crosses | Navajo River |
| Coordinates | 36.94832, -107.07195 |
Condition Ratings
| Overall Condition | Poor |
| Deck | 4 (Poor) |
| Superstructure | 5 (Fair) |
| Substructure | 4 (Poor) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 63.3 ft (19.3 m) |
| Max Span | 58.4 ft (17.8 m) |
| Deck Width | 11.8 ft (3.6 m) |
| Deck Area | 69.5 sq m |
| Main Spans | 1 |
| Year Built | 1973 |
Traffic
| Avg Daily Traffic | 30 (2023) |
| Truck Traffic | 5% |
| Lanes On Bridge | 1 |
Inspection & Ownership
| Last Inspection | 323 |
| Inspection Frequency | Every 24 months |
| Owner | Bureau of Indian Affairs |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 00000000000M302 |