IRR BIA RTE 9 over Navajo River
Fair Condition28 years old100 vehicles/day
Location
| State | New Mexico |
| County | Rio Arriba |
| Location | 6.4 Km West Of Dulce Nm |
| Carries | IRR BIA RTE 9 |
| Crosses | Navajo River |
| Coordinates | 36.94667, -107.06163 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 121.7 ft (37.1 m) |
| Max Span | 40.7 ft (12.4 m) |
| Deck Width | 34.8 ft (10.6 m) |
| Deck Area | 393.3 sq m |
| Main Spans | 3 |
| Year Built | 1998 |
Traffic
| Avg Daily Traffic | 100 (2023) |
| Truck Traffic | 10% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 323 |
| Inspection Frequency | Every 24 months |
| Owner | Bureau of Indian Affairs |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 00000000000M317 |