IRR BIA RTE 2 over Navajo River
Fair Condition42 years old100 vehicles/day
Location
| State | New Mexico |
| County | Rio Arriba |
| Location | 2.4 Km North Of Dulce Nm |
| Carries | IRR BIA RTE 2 |
| Crosses | Navajo River |
| Coordinates | 36.96111, -106.97833 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 108.9 ft (33.2 m) |
| Max Span | 69.9 ft (21.3 m) |
| Deck Width | 34.1 ft (10.4 m) |
| Deck Area | 345.3 sq m |
| Main Spans | 3 |
| Year Built | 1984 |
Traffic
| Avg Daily Traffic | 100 (2023) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 323 |
| Inspection Frequency | Every 24 months |
| Owner | Bureau of Indian Affairs |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 00000000000M316 |