RTE I678 over 25ax Flushing Bay Prome
Good Condition17 years old127,491 vehicles/day
Location
| State | New York |
| County | Queens |
| Location | Jct I495 & I678 |
| Carries | RTE I678 |
| Crosses | 25ax Flushing Bay Prome |
| Coordinates | 40.76249, -73.83937 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 9 (Excellent) |
| Substructure | 7 (Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel |
| Design | Box Beam - Multiple |
| Total Length | 2990.2 ft (911.4 m) |
| Max Span | 306.4 ft (93.4 m) |
| Deck Width | 42.3 ft (12.9 m) |
| Deck Area | 11757.1 sq m |
| Main Spans | 18 |
| Year Built | 2009 |
Traffic
| Avg Daily Traffic | 127,491 (2021) |
| Truck Traffic | 11% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 19 |
Inspection & Ownership
| Last Inspection | October 2023 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 00000000105578J |