Bair Road over Redwood Creek

Fair Condition76 years old113 vehicles/day

Location

StateCalifornia
CountyHumboldt
Location3.4 Mi N/o SR 299
CarriesBair Road
CrossesRedwood Creek
Coordinates40.96364, -123.84048

Condition Ratings

Overall ConditionFair
Deck5 (Fair)
Superstructure5 (Fair)
Substructure5 (Fair)
Channel/Waterway6 (Satisfactory)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialSteel
DesignTruss - Thru
Total Length144.0 ft (43.9 m)
Max Span100.1 ft (30.5 m)
Deck Width23.0 ft (7 m)
Deck Area307.3 sq m
Main Spans1
Year Built1950 (reconstructed 1967)

Traffic

Avg Daily Traffic113 (2006)
Truck Traffic1%
Lanes On Bridge2

Inspection & Ownership

Last Inspection623
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number04C0116

Nearby Bridges