Township Road 110 over Halfway Run * Olin
Fair Condition102 years old209 vehicles/day
Location
| State | Ohio |
| County | Washington |
| Location | 1.27 Mi N Of Jct CR 126 |
| Carries | Township Road 110 |
| Crosses | Halfway Run * Olin |
| Coordinates | 39.44028, -81.55417 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 31.2 ft (9.5 m) |
| Max Span | 26.9 ft (8.2 m) |
| Deck Width | 20.0 ft (6.1 m) |
| Deck Area | 58.0 sq m |
| Main Spans | 1 |
| Year Built | 1924 (reconstructed 1997) |
Traffic
| Avg Daily Traffic | 209 (2015) |
| Truck Traffic | 7% |
| Lanes On Bridge | 1 |
Inspection & Ownership
| Last Inspection | 424 |
| Inspection Frequency | Every 12 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 8436673 |