Morrison ST over I-5 & Or 99e
Fair Condition71 years old37,316 vehicles/day
Location
| State | Oregon |
| County | Multnomah |
| Location | Between I-5 & SE Grand Av |
| Carries | Morrison ST |
| Crosses | I-5 & Or 99e |
| Coordinates | 45.51723, -122.66385 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 1548.6 ft (472 m) |
| Max Span | 133.9 ft (40.8 m) |
| Deck Width | 48.9 ft (14.9 m) |
| Deck Area | 7032.8 sq m |
| Main Spans | 23 |
| Year Built | 1955 |
Traffic
| Avg Daily Traffic | 37,316 (2020) |
| Truck Traffic | 10% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 17 |
Inspection & Ownership
| Last Inspection | 225 |
| Inspection Frequency | Every 12 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 08589 614 00005 |