Off Ramp over Water AVE Conn EB
Fair Condition68 years old1,606 vehicles/day
Location
| State | Oregon |
| County | Multnomah |
| Location | East End Morrison Br |
| Carries | Off Ramp |
| Crosses | Water AVE Conn EB |
| Coordinates | 45.51670, -122.66713 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 8 (Very Good) |
| Substructure | 8 (Very Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 330.1 ft (100.6 m) |
| Max Span | 139.1 ft (42.4 m) |
| Deck Width | 30.8 ft (9.4 m) |
| Deck Area | 945.6 sq m |
| Main Spans | 3 |
| Year Built | 1958 |
Traffic
| Avg Daily Traffic | 1,606 (2020) |
| Truck Traffic | 10% |
| Lanes On Bridge | 1 |
| Lanes Under Bridge | 7 |
Inspection & Ownership
| Last Inspection | 225 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 08589Y614 00000 |