E Fremont Approach over City Streets
Fair Condition53 years old103,251 vehicles/day
Location
| State | Oregon |
| County | Multnomah |
| Location | E Fremont Intrchnge |
| Carries | E Fremont Approach |
| Crosses | City Streets |
| Coordinates | 45.54090, -122.67950 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Box Beam - Multiple |
| Total Length | 654.9 ft (199.6 m) |
| Max Span | 255.9 ft (78 m) |
| Deck Width | 143.0 ft (43.6 m) |
| Deck Area | 8702.6 sq m |
| Main Spans | 3 |
| Year Built | 1973 |
Traffic
| Avg Daily Traffic | 103,251 (2022) |
| Truck Traffic | 8% |
| Lanes On Bridge | 8 |
| Lanes Under Bridge | 3 |
Inspection & Ownership
| Last Inspection | October 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 08958 061 00358 |