E Fremont Approach over City Streets Rr
Fair Condition53 years old103,251 vehicles/day
Location
| State | Oregon |
| County | Multnomah |
| Location | E Fremont Intrchge |
| Carries | E Fremont Approach |
| Crosses | City Streets Rr |
| Coordinates | 45.54202, -122.67819 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Box Beam - Multiple |
| Total Length | 709.0 ft (216.1 m) |
| Max Span | 204.1 ft (62.2 m) |
| Deck Width | 143.0 ft (43.6 m) |
| Deck Area | 9422.0 sq m |
| Main Spans | 4 |
| Year Built | 1973 |
Traffic
| Avg Daily Traffic | 103,251 (2022) |
| Truck Traffic | 8% |
| Lanes On Bridge | 8 |
| Lanes Under Bridge | 5 |
Inspection & Ownership
| Last Inspection | October 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 08958B061 00372 |