Yeon/front-nw 26th over B-129 Over Bn/sfrr
Fair Condition39 years old5,200 vehicles/day
Location
| State | Oregon |
| County | Multnomah |
| Location | NW Front/nw Yeon Connect |
| Carries | Yeon/front-nw 26th |
| Crosses | B-129 Over Bn/sfrr |
| Coordinates | 45.54581, -122.70335 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 8 (Very Good) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 1319.9 ft (402.3 m) |
| Max Span | 204.1 ft (62.2 m) |
| Deck Width | 48.9 ft (14.9 m) |
| Deck Area | 5994.3 sq m |
| Main Spans | 3 |
| Year Built | 1987 |
Traffic
| Avg Daily Traffic | 5,200 (2020) |
| Truck Traffic | 20% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 924 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 16660 000000000 |