Division AVE over West Bank Trail
Good Condition15 years old238 vehicles/day
Location
| State | Oregon |
| County | Lane |
| Location | NW Of Willamette River |
| Carries | Division AVE |
| Crosses | West Bank Trail |
| Coordinates | 44.09758, -123.10968 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Slab |
| Total Length | 25.9 ft (7.9 m) |
| Max Span | 25.9 ft (7.9 m) |
| Deck Width | 40.0 ft (12.2 m) |
| Deck Area | 96.4 sq m |
| Main Spans | 1 |
| Year Built | 2011 |
Traffic
| Avg Daily Traffic | 238 (2020) |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 523 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 21408 000 00000 |