SR 4010 Hershey RD over Over SR 79 Nb/sb
Fair Condition61 years old3,244 vehicles/day
Location
| State | Pennsylvania |
| County | Erie |
| Location | Summit Township |
| Carries | SR 4010 Hershey RD |
| Crosses | Over SR 79 Nb/sb |
| Coordinates | 42.04537, -80.11584 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 5 (Fair) |
| Substructure | 5 (Fair) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 295.9 ft (90.2 m) |
| Max Span | 74.1 ft (22.6 m) |
| Deck Width | 33.8 ft (10.3 m) |
| Deck Area | 929.1 sq m |
| Main Spans | 5 |
| Year Built | 1965 |
Traffic
| Avg Daily Traffic | 3,244 (2024) |
| Truck Traffic | 2% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 8 |
Inspection & Ownership
| Last Inspection | 823 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000000016367 |