Fap 1 over I440 Rp F & H
Fair Condition41 years old32,580 vehicles/day
Location
| State | Tennessee |
| County | Davidson |
| Location | I440 Innerchange |
| Carries | Fap 1 |
| Crosses | I440 Rp F & H |
| Coordinates | 36.13678, -86.82154 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Box Beam - Single/Spread |
| Total Length | 334.0 ft (101.8 m) |
| Max Span | 100.1 ft (30.5 m) |
| Deck Width | 97.1 ft (29.6 m) |
| Deck Area | 3013.3 sq m |
| Main Spans | 4 |
| Year Built | 1985 |
Traffic
| Avg Daily Traffic | 32,580 (2021) |
| Truck Traffic | 7% |
| Lanes On Bridge | 6 |
| Lanes Under Bridge | 6 |
Inspection & Ownership
| Last Inspection | 224 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 19I04400009 |