Fau 57 EB over Sr-57 Eb. / I-240

Good Condition7 years old72,151 vehicles/day

Location

StateTennessee
CountyShelby
LocationSr-57 / I-240
CarriesFau 57 EB
CrossesSr-57 Eb. / I-240
Coordinates35.09917, -89.86777

Condition Ratings

Overall ConditionGood
Deck8 (Very Good)
Superstructure8 (Very Good)
Substructure8 (Very Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialSteel
DesignStringer/Multi-beam
Total Length220.8 ft (67.3 m)
Max Span135.5 ft (41.3 m)
Deck Width71.9 ft (21.9 m)
Deck Area1473.9 sq m
Main Spans2
Year Built2019

Traffic

Avg Daily Traffic72,151 (2021)
Truck Traffic8%
Lanes On Bridge4
Lanes Under Bridge8

Inspection & Ownership

Last Inspection323
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceHistorical significance is not determined
Structure Number79I02400111

Nearby Bridges