Fau 57 Ebl over Sr57 EB / Sr57 WB Ramp
Fair Condition67 years old48,802 vehicles/day
Location
| State | Tennessee |
| County | Shelby |
| Location | I-240 Junction |
| Carries | Fau 57 Ebl |
| Crosses | Sr57 EB / Sr57 WB Ramp |
| Coordinates | 35.10278, -89.87183 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 226.0 ft (68.9 m) |
| Max Span | 96.1 ft (29.3 m) |
| Deck Width | 34.1 ft (10.4 m) |
| Deck Area | 716.6 sq m |
| Main Spans | 3 |
| Year Built | 1959 |
Traffic
| Avg Daily Traffic | 48,802 (2021) |
| Truck Traffic | 8% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 1 |
Inspection & Ownership
| Last Inspection | 225 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 79SR0570003 |