IH 30 EB over Rock Creek Relief #3

Fair Condition66 years old18,003 vehicles/day

Location

StateTexas
CountyHopkins
Location5.70 Mi E Of SH 19
CarriesIH 30 EB
CrossesRock Creek Relief #3
Coordinates33.14602, -95.55087

Condition Ratings

Overall ConditionFair
Deck5 (Fair)
Superstructure5 (Fair)
Substructure7 (Good)
Channel/Waterway7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignStringer/Multi-beam
Total Length90.9 ft (27.7 m)
Max Span29.9 ft (9.1 m)
Deck Width39.7 ft (12.1 m)
Deck Area335.2 sq m
Main Spans3
Year Built1960

Traffic

Avg Daily Traffic18,003 (2019)
Truck Traffic31%
Lanes On Bridge2

Inspection & Ownership

Last Inspection123
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is possibly eligible (requires evaluation)
Structure Number011130001002119

Nearby Bridges