IH 30 WB over Rock Creek Relief #3
Good Condition13 years old19,874 vehicles/day
Location
| State | Texas |
| County | Hopkins |
| Location | 5.70 Mie Of SH 19 |
| Carries | IH 30 WB |
| Crosses | Rock Creek Relief #3 |
| Coordinates | 33.14620, -95.55090 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Other |
| Total Length | 111.9 ft (34.1 m) |
| Max Span | 49.9 ft (15.2 m) |
| Deck Width | 45.9 ft (14 m) |
| Deck Area | 477.4 sq m |
| Main Spans | 1 |
| Year Built | 2013 |
Traffic
| Avg Daily Traffic | 19,874 (2019) |
| Truck Traffic | 31% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 125 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 011130001002260 |