IH 40 EB over FM 295
Fair Condition48 years old6,154 vehicles/day
Location
| State | Texas |
| County | Carson |
| Location | 0.8 Mi N Of US 66 |
| Carries | IH 40 EB |
| Crosses | FM 295 |
| Coordinates | 35.21276, -101.11718 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 204.1 ft (62.2 m) |
| Max Span | 88.9 ft (27.1 m) |
| Deck Width | 44.3 ft (13.5 m) |
| Deck Area | 839.7 sq m |
| Main Spans | 1 |
| Year Built | 1978 |
Traffic
| Avg Daily Traffic | 6,154 (2018) |
| Truck Traffic | 47% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | October 2024 |
| Inspection Frequency | Every 48 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 040330027504122 |