US 285 over Escondido Draw
Fair Condition77 years old1,455 vehicles/day
Location
| State | Texas |
| County | Pecos |
| Location | 33.0 Mi SE Of IH 10 Bus |
| Carries | US 285 |
| Crosses | Escondido Draw |
| Coordinates | 30.52368, -102.55466 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 7 (Good) |
| Culvert | 5 (Fair) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 153.2 ft (46.7 m) |
| Max Span | 8.9 ft (2.7 m) |
| Deck Width | 41.7 ft (12.7 m) |
| Deck Area | 593.1 sq m |
| Main Spans | 14 |
| Year Built | 1949 (reconstructed 1961) |
Traffic
| Avg Daily Traffic | 1,455 (2022) |
| Truck Traffic | 69% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is possibly eligible (requires evaluation) |
| Structure Number | 061860029302009 |