N Teilman Avenue over Houghton Canal
Fair Condition28 years old2,491 vehicles/day
Location
| State | California |
| County | Fresno |
| Location | At Nielsen AVE |
| Carries | N Teilman Avenue |
| Crosses | Houghton Canal |
| Coordinates | 36.74319, -119.82198 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 9 (Excellent) |
| Culvert | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Culvert |
| Total Length | 29.9 ft (9.1 m) |
| Max Span | 14.8 ft (4.5 m) |
| Deck Width | 37.4 ft (11.4 m) |
| Deck Area | 103.7 sq m |
| Main Spans | 2 |
| Year Built | 1998 |
Traffic
| Avg Daily Traffic | 2,491 (2009) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 125 |
| Inspection Frequency | Every 48 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 42C0608 |