IH 20 EB over Pecos River Relief 2

Fair Condition58 years old9,476 vehicles/day

Location

StateTexas
CountyWard
Location0.30 Mi NE Of Reeves C/l
CarriesIH 20 EB
CrossesPecos River Relief 2
Coordinates31.43007, -103.38574

Condition Ratings

Overall ConditionFair
Channel/Waterway8 (Very Good)
Culvert6 (Satisfactory)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignCulvert
Total Length153.9 ft (46.9 m)
Max Span7.9 ft (2.4 m)
Deck Width53.1 ft (16.2 m)
Deck Area759.8 sq m
Main Spans18
Year Built1968

Traffic

Avg Daily Traffic9,476 (2022)
Truck Traffic53%
Lanes On Bridge2

Inspection & Ownership

Last InspectionNovember 2023
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is possibly eligible (requires evaluation)
Structure Number062380000402051

Nearby Bridges